Reformation Lutheran Church
An expansion of existing Narthex
Location: Las Vegas, Nevada
Area: 900 sf
Construction: Existing
Construction cost: 35,000
Date of completion: 1992
Liberty Baptist Church
A new church & classroom building
Location: Las Vegas, Nevada
Capacity: 300 seats
Area: 12,000 sf
Construction: Pre-engineered steel with stucco and tile roof
Construction cost: 889,000
Date of completion: 1991
Calvary Lutheran Church
A remodel and expansion of Narthex and offices
Location: Henderson, Nevada
Capacity: 450 seats
Area: 6,500 sf
Construction: Existing
Construction cost: 25,000
Date of completion: 1991
St. Paul’s Baptist Church
A code update for existing church building
Location: Boise, Idaho
Capacity: 700 seats
Area: 12,500 sf
Construction: Existing
Construction cost: 78,000
Date of completion: 1992
St. Paul Catholic Church
Liturgical Renewal
Location: Nampa, Idaho
Capacity: 450 seats
Area: 8,500 sf
Construction: Wood and steel framed with wood first floor, above social hall . Brick exterior finish and pitched shingle roof.
Construction cost: 50,000
Date of completion: Completed after I left Boise.
Christ the King Catholic Church
Convert nursery into gift shop and add space
Location: Las Vegas, Nevada
Area: 600 sf
Construction: Existing
Construction cost: 38,000
Date of completion: 1992
Bally Hotel Employee Credit Union
A new Bank building
Location: Las Vegas, Nevada
Area: 6,200 sf
Construction: Wood framed with concrete first floor slab. Stucco exterior finish and flat built-up roof. Clerestory windows above teller spaces, sun reflector/ shades above windows.
Construction cost: 610,000
Date of completion: 1991
Mt. Nebo Baptist Church
New church building including worship space, kitchen galley, office loft
Location: South Chicago, Illinois
Area: 7500 sf
Construction: Concrete slab on grade. Metal framing roof and walls and second floor.
Construction cost: 635,000
Architect: Church Building Consultants, Inc
Project architect: Dennis McLaughlin
Date of completion: 2002
Cragin and Pike Insurance
Office building
Location: Las Vegas, Nevada
Area: 6,500 sf
Construction: Wood framed with concrete first floor slab. Salt and peppered Colored concrete block exterior finish and flat built-up roof. Glass pyramid skylight.
Construction cost: 750,000
Date of completion: 1991
Life Manor Senior Living
A new retirement tower & community building
Location: Tacoma, Washington
Capacity: Five story.150 apartments.
Area: 190,000 sf (approx)
Construction: CMU demising, bearing walls, pre-cast concrete core-floor panels with 3 “ lightweight topping slab. Exterior walls pre-assembled brick panels.
Architect: DMJM
Designer: Dennis McLaughlin
Date of completion: 1981
Cassia Industrial Building
A new office/industrial Building:
Location: Henderson, Nevada
Area: 25,500 sf
Construction: Slab on grade, Tilt-up concrete exterior and demising walls. Wall framing steel studs. Single ply-roofijng
Steel Roof framing: Plywood sheathing over wood joists on laminated beams.. Painted concrete exterior walls. Aluminum storefront.
Construction cost: 2,300,000
Date of completion: 1992
American Red Cross of Oregon
Major remodel of laboratories and addition
Location: Portland, Oregon
Area added: 11,500 sf
Construction: Wood and steel framed with concrete first floor slab Stucco exterior finish and flat built-up roof.
Construction cost: 1,200,000
Date of completion: 1985
Maurice Dear Apartments
Adaptive reuse of old urban hotel
Location: Portland, Oregon
Capacity: 25 apartments
Area: 10,500 sf
Construction: Existing construction. Un-reinforced brick construction required seismic upgrade. Diagonal bracing interior face of exterior wall. Reinforced concrete elevator tower. Plywood sheathed floors. Exterior wall secured to floor with through bolts and straps.
Construction cost: 687,000
Date of completion: 1989
Amalfi Condominiums
Four new condominiums
Location: Portland, Oregon
Capacity: 4 condominium units
Area: 15,000 sf (approx)
Construction: Wood and steel framed with concrete first floor slab, wood framed second floor. Stucco exterior finish, and Mission tiled pitched roof.
Construction cost: 660,000
Date of completion: 1984
Parks Residence
A new strawbale home
Location: Las Vegas, Nevada
Area: 3,500 sf
Construction: Concrete slab on grade, wood post and beam construction. Wood Floor framing with 1.5” lightweight topping slab: Strawbale infill. Stucco exterior finish, plaster of that interior finish. Wood partition framing.
Owner participated in construction.
Construction cost: 110,000
Date of completion: 1998
Kauder Residence
A new strawbale home
Location: Las Vegas, Nevada
Area: 2,500 sf
Construction: Concrete slab on grade, wood post and beam construction. Strawbale infill. Stucco exterior finish, plaster of that interior finish. Wood partition framing.
Construction cost: 125,000
Date of completion: 1999
Aerojet Industrial Site
Manufacturing facility with 2-story office building
Location: Las vegas, Nevada
Capacity: 4 condominium units
Area: 22,000 sf (approx)
Construction: Steel framed with concrete first floor slab, Stucco exterior finish, and Mission Single ply flat roof.
Construction cost: 1,300,000
Architect: J.C. Wallace Engineering, Inc
Designer: Dennis J. McLaughlin
Date of completion: 1985
Las Vegas Country Club Estates
3-guardhouses
Location: Las Vegas, Nevada
Area: 15,000 sf (approx)
Construction: Steel framed with concrete first floor slab, Brick exsterior with large glass view windows. Grey Slate pitched roof.
Construction cost: 300,000
Date of completion: 1985
Senior Citizen Housing
150 Apartments, 23 stories
Location: Caldwell, Idaho
Area: 165,000 sf (approx)
Construction: Wood and steel framed with concrete first floor slab, wood framed second floor. Stucco exterior finish, and Wood shingle pitched roof.
Construction cost: not known
Architect: DMJM
Designer: Dennis J. McLaughlin
Date of completion: 1975
Lutheran Deaf Housing
143 Apartments
Location: Portland, Oregon
Capacity: 4 condominium units
Area: 15,000 sf (approx)
Construction: Wood and steel framed with concrete first floor slab, wood framed second floor. Stucco exterior finish, and Mission tiled pitched roof.
Construction cost: 660,000
Architect: DMJM architects
Project Architect: Dennis J. McLaughlin
Date of completion: 1975
Meadows Shopping Mall
Three retail tenant improvements
Location: Las Vegas, Nevada
Area: Average apartment size: 850sf (approx)
Construction: Existing
Construction cost: not known
Date of completion: 1987 – 1988
Galleria Shopping Mall
One retail tenant improvements
Location: Henderson, Nevada
Area: Average apartment size: 850sf (approx)
Construction: Existing
Construction cost: not known
Architect: Dennis J. McLaughlin
Date of completion: 1988– 1989
Apartment Community Projects
600 Apartments
Location: Las Vegas, Nevada
Area: Average apartment size: 800sf (approx)
Construction: Wood and steel framed with concrete first floor slab, wood framed second floor. Stucco exterior finish, and Wood shingle tiled pitched roof.
Architect/engineer: J.C. Wallace Engineering, Inc
Project architect: Dennis J. McLaughlin
Date of completion: 1990
Fourteen Single Family Projects
Miscellaneous homes
Location: Portland, Oregon; Boise, Idaho; Las Vegas, Nevada
Construction: Wood and steel framed with concrete first floor slab, wood framed second floor. Stucco exterior finish, and Wood shingle tiled pitched roof.
Date of completion: 1974 – 1983
Apartment Community Competition
86 Apartments
Location: Boise, Idaho
Area: Average apartment size: 850sf (approx)
Construction: Wood and steel framed with concrete first floor slab, wood framed second floor. Stucco exterior finish, and Wood shingle tiled pitched roof.
Date of completion: 1993
Piper-Dunes Luxury Condominium
140 condominium units (water intrusion repair)
Location: Amelia Island, Florida
Construction: Construction claim- water intrusion
Date of completion: 2004
Legends Plaza Shopping Center
Tenant improvment including sports bar and retired athlete museum
Location: Jacksonville, Florida
Area: 17500 sf
Construction: Concrete slab on grade. Wood framing roof and walls and second floor.
Construction cost: 635,000 est
Date of completion: In planning stage
First Federal Bank Office Building
Tenant improvement
Location: Lake City, FL
Area: 11500 sf
Construction: Concrete slab on grade. Concrete slab on steel deck and Steel mainframe. Steel roof trusses. Concrete tile roofing.
Construction cost: 1,100,000
Architect: PQH Architects in Jacksonville, FL
Project Manager: Dennis McLaughlin
Date of completion: September 2006
Parsons Residence Addition
A remodel and addition
Location: Jacksonville, FL
Area: 3,200 sf
Construction: wood frame
Date of completion: 2004
New York New York Subs
Tenant improvement: Restaurant
Location: Jacksonville, FL
Area: 1,500 sf
Construction cost: 45,000
Date of completion: September 2005
Telecommunications Installations
Location: Many US cities
Area: 1,500 sf
Construction: Tenant improvement projects
Architect: Carter-Burgess
Project Manager: Dennis McLaughlin
Date of completion: 1999-2001
The Berkshire at Lake Weir
98 luxury condominiums. 2-story apartments, five 4-story buildings and clubhouse with extensive site amenities
Location: Ocala, Florida
Area: approx 300,000 sf
Construction: Concrete topping slab over pre-cast panels over pre-cast concrete beams. Stucco over Pre-cast concrete wall panels and gypboard over steel partition framing. Metal roofing over wood trusses.
Architect: Steven E.Hutchins in Jacksonville, FL
Project manager: Dennis J. McLaughlin
Date of completion: 2006
Calabash Boom Housing Project
88 Apartments & condominium
Location: St Croix, Virgin Islands
Area: Average 100,000 sf
Construction: Concrete topping slab over Pre-cast concrete panels. Stucco over Pre-cast concrete wall panels and gypboard over steel partition framing. Metal roofing over wood trusses.
Architect: Steven E.Hutchins in Jacksonville, FL
Project manager: Dennis J. McLaughlin
Date of completion: 2006
Columbian Apartments
Renovation of 180 Apartments & condominium
Location: St. Petersburg, FL
No. stories: 18
Area: 100,000 sf
Construction: Existing Poured-in-place concrete. Project included demolition of existing apartmernts, revise, plumbing and electrical, replace central HVAC w/ window units. New public areas, circulation. Code up grade
Architect: Steven E Hutchins in Jacksonville, FL
Project manager: Dennis J. McLaughlin
Date of completion: 2006
Taylor Residence
(water intrusion repair) Single family residence
Location: Mandarin, Jacksonville, Florida
Project: Construction claim- water intrusion
Date of completion: 2004
Boulder City Veterans Home
88 Apartments & condominium
Location: Boulder City, Nevada
Area: 81,100 sf
Cost: 11.3 million
Construction: Concrete floor slab. Metal framing wall and roof. Asphalt shingle roofing . Stucco .
Completion date: 2000
Architect: HCA Architects
Job Captain: Dennis McLaughlin
London Residence
Addition
Location: Jacksonville, FL
Area: 741 sf
Cost: 77,000
Construction: concrete floor slab, wood framing, pre-eng. Trusses, asphaltic shingles
Completion date: 2007
Aiken Street Exercise/Garage
New building
Location: Jacksonville, FL
Area: 850 sf
Cost: est. 85,000
Construction: concrete floor slab, wood framing, TJI joists. Standing seam metal roof
Completion date: 2007
Mission Road Baptist Church
63% Addition and remodel
Location: Palatka, FL
Area: 2100 sf
Construction: Concrete slab, CMU walls, shingles over wood pre-eng. Trusses.
Construction cost: 140,000
Completion date: bidding
Keberenge Residence
Preliminary Design
Location: Kenya, Africa
Area: 3,800 sf
Construction: Concrete slab, concrete walls, clay tiles over steel pre-eng. Trusses.
Construction cost: 1.5 million ((est)
Completion date: bidding
Kitchen Remodel
50% remodel
Location: Jacksonville, FL
Area: 300 sf
Construction: Concrete slab, Wood frame.
Construction cost: 55,000