Phase VIII: Post-Construction

(Assure building committee of warrantees and maintainence processes, necessary in the buildings continuing and safe operation)

  1. Verify AS-Built drawings provide by contractor.
  2. Review maintenance manuals and instructions from subcontractors
  3. Educate congregation to properly maintain and operate the building
  4. Receive feedback from parish and governing body
  5. Assemble team for post construction.
  6. Attend dedication
Share and Enjoy:
  • Print
  • email
  • RSS
  • Facebook
  • Twitter
  • LinkedIn
  • del.icio.us
  • Digg
  • Google Bookmarks
  • FriendFeed
  • Netvibes
  • StumbleUpon
  • Technorati
  • Tumblr
  • Yahoo! Bookmarks